Sl.
No.

Name of Project

Estimated Cost
(In Million Taka)

Implementation Period

Objective of the Project

Main Items of the Project

(A) Approved Project :

01.

Dredging at the Harbour Area in the Pussur Channel of Mongla Port

1320.00

2010-11 to 2014-15

Maintain adequate depth in the Harbour area of Pussur Channel of Mongla Port to facilitate berthing of 7.5 m. draft ships at Port Jetty and Mooring Buoy.

About 35.11 lac cum. dredging will be done.

02.

Dredging at the Outer Bar in the Pussur Channel

1786.80

2006-07 to 2015-16

Increase navigability at the Outer bar area of the Pussur Channel to facilitate easy entrance and maneuvering of more than 9 metre draft ships in the anchorage area of Mongla Port.

About 43.52 lac cum. dredging will be done.

03.

Procurement of 6 nos. Dredgers and Ancillary Crafts and Accessories for Ministry of Water Resources & Ministry of Shipping (Mongla Port-1 no., BIWTA-3nos, BWDB-2nos.)

1042.571

Aug. 2010 to June 2015

Procurement of dredger for MPA is to maintain adequate depth in the Pussur Channel.

1no. 18" Cutter Suction Dredger, 1no. Crane/Work Boat, 1no. Crew House Boat., Officer House boat 1no. will be procured.

04.

Procurement of Container and Cargo Handling Equipment

875.60

Jan. 2014 to June 2016

Procurement of container and cargo handling equipment to ensure fast and reliable service to port users improving cargo handling efficiency of Mongla Port.

1no. 100 ton capacity Tire mounted mobile carne, 1 no. 50 ton capacity mobile crane, 2nos. Rail mounted dock site crane, 1no. Heavy duty forklift truck, 2nos. Reach Stacker, 2nos Forklift with side shifter, 4nos. Forklift, 6nos. Low mast forklift truck and 3nos 40 ton capacity Straddle Carrier 3 nos. will be procured.

(B) Project under process of approval:

05.

Comprehensive Security Enhancement of Mongla Port

1170.00

July 2014 to June 2016

To ensure security of goods and properties, improving law and order situation in the port protected area, preventing theft, pilferage, crime and piracy.

1 Single Cabin Fire Pick Up, 1 Double Cabin Fire Pick Up, 2 Petrol cum Rescue Boat, 1 Beam Lifter, 2 Double Cabin Security Petrol Car, 6 Motor cycle, Replacement of ASI, 1 Container Scanner, 4 Archway Metal Detector, VHF Radio, 8 Day-Night Binocular will be procured. Computerized Security System will be installed and Gate, Watch Tower, Boundary Wall will be constructed.

06.

Sheet Piling at Jetty no. 5 to 9 of Mongla Port.

716.10

July 2014 to June 2016

Protect sliding of accumulated soil underneath the jetty; reduce siltation rate in the jetty front area of the channel and maintain adequate draft at jetty front.

Sheet Piling will be constructed in front of the Jetty no. 5 to 9.

(C) Project under process of preparation:

07.

Capital Dredging from Jetty No. 9 to Upstream 13 Km. of Pussur Channel

1700.00

Dec. 2014 to June 2017

Development of navigability up to 13 km. upstream in the river route to ensure smooth and safe movement of vessel bound for coal power station, Rampal, Bagerhat.

The project about 2.90 million Cum. dredging will be done.

08.

Removal of Wrecks from the Pussur Channel.

500.00

Dec. 2014 to June 2019

Safely maneuvering of sea-going vessels sunken wrecks in the Pussur channel will be removed

18 nos. wrecks will be removed from the Pussur Channel.

08.

Removal of Wrecks from the Pussur Channel.

500.00

Dec. 2014 to June 2019

Safely maneuvering of sea-going vessels sunken wrecks in the Pussur channel will be removed

18 nos. wrecks will be removed from the Pussur Channel.

09.

Procurement of Harbour Crafts of Mongla Port

3700.00

2014-15 to 2017-18

Provide faster service project will be undertaken

1no. Berthing Tug, 1no. Buoy Laying Vessel, 1no. Fire Fighting Tug, 1no. Dispatch boat, 1no. Pilot Boat, 1no. Mother Survey Vessel, 2nos. Survey Work Boat, 2nos. Mooring Boat and 1no. Self Propelled Water Barge will be procured.

10.

Procurement of a Trailing Suction Hopper Dredger for Mongla Port

3250.00

Dec. 2014 to June 2017

Maintain adequate depth in the Pussur Channel continuous maintenance dredging will be done.

1no. Trailing Suction Hopper dredger, 2nos. Self Discharging Soil Carrying Barge, 1no. Tug Boat and 1no. Crane Boat will be procured.

11.

Construction of Container Yard

500.00

2015-16 to 2017-18

To enhance the container handling capacity container yard with modern equipment will be established.

1no. Container yard with modern equipment will be constructed.

12.

Construction of Multipurpose Berth with backup facilities of Mongla Port

8500.00

2015-16 to 2019-20

Reduce turn round time of sea going vessel and dwell time of container.

4nos. Rubber Tyred Gantry Crane, 2nos. Straddle Carrier, 2nos. Mobile Harbour Crane, 8 nos. Forklift, 8 nos. Trailer, 2nos. Jeeps, 2nos. Pickup & 6 nos. Motor Cycle will be procured and 1no. Multipurpose and Container Jetty, 1no. Container Terminal, Water Supply Line, Approach Road, Power Sub station, High Mast Tower, Drain & Culvert will be constructed.


COVID19 Movement Pass Online Police Clearance BD Police Help line Expatriate Cell Opinion or Complaint NIS Bangladesh Police Hot Line Number Right to Information PIMS Police Cyber Support for Women BPWN Annual Training Workshop Achievement & Success PHQ Invitation Card
Press Release Recruitment Information Procurement / Tender Notice Legal Instrument Innovation Corner Detective Magazine Bangladesh Football Club Diabetes-Covid19 Exam Results Accident Info Important Forms

Apps

icon icon icon icon icon icon