ড্রেজিং তথ্য

Mongla Port was designed for berthing ships having 8.50 m draft. Upto 1980 there was not any siltation problem either in Jetty front or Channel area. But after 1980 siltation started in Jetty front Area. From that time regular maintenance dredging was performed in jetty front area. In the meantime it was seen that siltation has started in Harbour Area (About 13 Km downstream from Port Jetty). Due to this siltation, 03 times capital dredging project has implemented in the year of 1994 - 1995, 2004 - 2005 & 2013-2014. To ensure the safe movement of Coal Carrying vessels of Rampal Power Plant, the Channel between Mongla Port to Power Plant has dredged in 2017-2019. The entrance Channel of Mongla Port known as outer Bar, which has dredged in 2019-20. After outer Bar Dredging, 9.5-10 m draft ship is coming at anchorage area of Mongla Port. For regular maintenance dredging, Mongla Port Authority have 02 nos 18” dia Cutter Suction Dredger.

Ongoing Dredging: 

  • Presently dredging at Inner Bar (Mongla Port to Harbaria) is ongoing. Total 23.4 km and 21.06 Million cu.m will be dredged by 2022. After completion of this project, minimum 9.5 meter draft vessel will be able to berth at Jetty.
  • Regular Maintenance dredging at Berth/ Jetty area is also ongoing through MPA's Dredger.

Under Preparation Process: To maintain the channel depth minimum 8.5 m, long term maintenance dredging project is under preparation process.

Dredging History

From the establishment of the Port, the quantity of maintenance dredging by MPA’s own fund is as follows:

Dredging period

Dredging Area

Dredging Quantity

(Lac cu.m)

Dredger Type

1979-1981

Jetty front(J5-J9)

3.25

CSD

1983-1987

Jetty front(J5-J9)

6.95

CSD

1988-1990

Jetty front(J5-J9) & Confluence

5.23

CSD

1991-1992

Harbour Area

35.51

CSD

1993-1996

Southern Anchorage confluence & Sabur Beacon

2.26

TSHD

1994-2001

Jetty front (J5-J9)

8.13

CSD

2000-2004

Harbour Area

27.9

CSD & TSHD

2003-2004

Jetty  no- 8 & 9

0.69

CSD

2004-2005

Jetty  no- 8 & 9

0.54

CSD

2005-2006

Jetty  no- 8 & 9

0.69

CSD

2007-2008

Jetty  no- 8 & 9

1.08

CSD

2009-2010

Jetty  no- 8 & 9

0.71

CSD

2012-2013

Jetty  no- 8 & 9

0.17

CSD

2013-2014

Harbour Area

34.06

CSD

2015-2016

Approach and Pontoon front of Nil Komol

1.55

CSD

2017-18

Jetty Front

1.40

CSD

Mongla Port to Rampal Power Plant

4.10

CSD

Approach to Nil Komol

0.38

CSD

2018-19

Jetty Front

1.25

CSD

Mongla Port to Rampal Power Plant

34.7

CSD & TSHD

Approach to Nil Komol

0.48

CSD

Food Silo Area

 

1.25

CSD

2019-20

Outer Bar

70.00

TSHD&CSD

Jetty Front

1.00

CSD

Food Silo Area

9.48

CSD

2020-21

Outer Bar

49.11

TSHD&CSD

Jetty Front

0.25

CSD

Inner Bar

28.30

CSD

Total

330.42

 


COVID19 Movement Pass Online Police Clearance BD Police Help line Expatriate Cell Opinion or Complaint NIS Bangladesh Police Hot Line Number Right to Information PIMS Police Cyber Support for Women BPWN Annual Training Workshop Achievement & Success PHQ Invitation Card
Press Release Recruitment Information Procurement / Tender Notice Legal Instrument Innovation Corner Detective Magazine Bangladesh Football Club Diabetes-Covid19 Exam Results Accident Info Important Forms

Apps

icon icon icon icon icon icon